Application

  • Client solution
  • In use

File check before a phase starts

Flagging deviations and risks

Who it is for

Site managers and work planners at an infrastructure contractor.

The problem in the work

A phase regularly started with an incomplete file. A missing inspection report only surfaced during execution, and then the work stood still while the crew was already on site.

What we designed and built

A check that puts the file next to the requirements of the phase and reports what is missing, with the source alongside it. And the work process around it: who gets the alert, who releases the phase and at what moment that happens.

What changed in the work

Releasing a phase has become an explicit step, with a name under it, instead of a tacit assumption.

Result

Across the first twelve phases the number of stoppages caused by a missing document fell from nine to two.

What this has to do with our services

This application comes out of the route we walk on every assignment: first decide which use case is worth it, then design the work, the roles and the decisions around it, and only after that build, test and measure.

Discuss a Proof of Value Back to the projects